Your cart is currently empty!
Lost Tramways of England: London South West
This was the area that witnessed the London United Tramway’s early trolleybus routes as well as operations of Croydon Corporation. Although many of the routes were to be converted before the outbreak of war in September 1939, a number were to survive right through until the final conversion of the system between 1950 and 1952.
Description
Hanes y rhwydwaith tramiau yng ngorllewin Llundain. Dyma’r ardal a dystiodd i’r llinellau tram cyntaf ynghyd â gweithgarwch y Croydon Corporation. Er i lawer o’r llinellau ddod i ben cyn dechrau’r rhyfel ym mis Medi 1939, goroesodd rhai ohonynt hyd at newid y system yn derfynol rhwng 1950 a 1952.This was the area that witnessed the London United Tramway’s early trolleybus routes as well as operations of Croydon Corporation. Although many of the routes were to be converted before the outbreak of war in September 1939, a number were to survive right through until the final conversion of the system between 1950 and 1952.
Additional information
| Language | English |
|---|





